Certification: | RoHS, CCC, ISO9001, CE |
---|---|
Working Medium: | R32 |
Heat Source Type: | Air Source Heat Pump |
Delivery Time: | 40-65days |
Color: | Silver/Customized |
Power Supply: | 380V/3pH/50Hz |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Upgrade your heating system today with our high efficiency heating solution from Guangdong Geme Refrigeration Equipment Co., Ltd. Our system operates with exceptional efficiency, ensuring optimal performance and energy savings.
Choose our heating solution from Guangdong Geme Refrigeration Equipment Co., Ltd for a reliable, cost-effective, and environmentally-friendly heating option. Upgrade your heating system today!
Model Code | CHP-8III/CD3 | CHP-10III/CD3 | CHP-12III/CD3 | CHP-14III/CD3 | CHP-16III/CD3 | |||
Power Supply | V/ph/Hz | 380-420/3/50 | ||||||
A7/W35 | Heating Capacity | KW | 8 | 10 | 12 | 14 | 16 | |
Heating Power Input | KW | 1.63 | 2.28 | 2.47 | 2.99 | 3.39 | ||
COP | W/W | 4.91 | 4.39 | 4.86 | 4.69 | 4.72 | ||
A-7/W35 | Heating Capacity | KW | 7.13 | 8.41 | 10.5 | 12.6 | 13.4 | |
Heating Power Input | KW | 2.38 | 2.8 | 3.48 | 4.34 | 4.41 | ||
COP | W/W | 3.00 | 3.00 | 3.02 | 2.9 | 3.04 | ||
A-7/W52 | Heating Capacity | KW | 6.8 | 8.5 | 10.6 | 12 | 12.5 | |
Heating Power Input | KW | 3.4 | 4.25 | 5.02 | 5.94 | 5.79 | ||
COP | W/W | 2.00 | 2.00 | 2.11 | 2.02 | 2.16 | ||
A-10/W55 | Heating Capacity | KW | 6.60 | 7.00 | 8.98 | 10.8 | 11.3 | |
Heating Power Input | KW | 3.47 | 3.68 | 5.19 | 5.93 | 5.95 | ||
COP | W/W | 1.90 | 1.90 | 1.73 | 1.82 | 1.90 | ||
A35/W18 | Heating Capacity | KW | 7.00 | 9.20 | 10.6 | 13.1 | 13.4 | |
Heating Power Input | KW | 1.52 | 2.00 | 2.57 | 3.25 | 3.54 | ||
COP | W/W | 4.60 | 4.60 | 4.13 | 4.03 | 3.78 | ||
A35/W7 | Cooling Capacity | KW | 6.40 | 7.90 | 10.5 | 12 | 13.6 | |
Cooling Power Input | KW | 2.13 | 2.43 | 3.68 | 4.21 | 4.98 | ||
EER | W/W | 3.00 | 3.25 | 2.85 | 2.85 | 2.73 | ||
Max input cerrent | A | 22 | 26 | 13 | 15 | 16 | ||
Max input power | KW | 4.4 | 5.3 | 6.5 | 7.4 | 8 | ||
Sound Power Level (EN12102 35ºC) | dB(A) | 56 | 58 | 60 | 62 | 64 | ||
Net/Gross weight | kg | 105/115 | 105/115 | 125/140 | 125/140 | 142/162 | ||
Operating Ambient Temperature | ºC | -25ºC-43ºC | ||||||
Water Flow | m3/h | 1.38 | 1.72 | 2.06 | 2.41 | 2.75 | ||
Unit outdoor Dimensions (L*W*H) | mm | 1091*424*798 | 1091*424*973 | 1091*424*1363 | ||||
Shipping Dimensions (L*W*H) | mm | 1162*518*885 | 1162*518*1060 | 1162*518*1450 |
* A7/W35:Performance Condition: Outdoor air 7ºC/6ºC, Inlet/Outlet water 30ºC/35ºC | |||||||||||||||
* A-7/W35:Performance Condition: Outdoor air -7ºC/-8ºC, Inlet/Outlet water 30ºC/35ºC | |||||||||||||||
* A-7/W52:Performance Condition: Outdoor air -7ºC/-8ºC, Inlet/Outlet water 44ºC/52ºC | |||||||||||||||
* A-10/W55:Performance Condition: Outdoor air -12ºC/-10ºC, Inlet/Outlet water 47ºC/55ºC | |||||||||||||||
* A35/W7:Performance Condition: Outdoor air 35ºC/24ºC, Inlet/Outlet water 7ºC/6ºC | |||||||||||||||
* A35/W18:Performance Condition: Outdoor air 35ºC/24ºC, Inlet/Outlet water 23ºC/18ºC | |||||||||||||||
* The above data is for reference only; specific data is subject to the product nameplate. | |||||||||||||||
* The above models and specification are for reference only,we can also make the OEM or ODM as per the customer's needs. |
Do you accept OEM & ODM? Yes, at Guangdong Geme Refrigeration Equipment Co., Ltd, we offer OEM and ODM services. We can produce standard products under clients' brand and design personalized products according to client's requirements.
Where is your factory location? Our headquarters is located in Foshan city, Guangdong Province, and we have a branch in Liuzhou city, Guangxi Province.
What is your annual output capacity? How many production lines do you have? We have an annual production capacity of 1,000,000 sets and operate with six production lines.
Do you offer technical support? Yes, we provide technical support to our customers. We offer technical manuals and online assistance. Additionally, we can send our technical experts to provide training in your country, with the training cost to be paid by the customer.
Where is your main overseas market? Our main overseas markets include Western Europe, Eastern Europe, and Central and Southeast Asia.
What is your payment term? We accept T/T (30% deposit in advance, balance 70% before shipment) and LC AT SIGHT.
How long is your Heat Pump delivery time? Normally, our Heat Pump delivery time is 50-65 days.
What is your MOQ? Wonder if you accept small orders? We accept small orders. Please feel free to contact us for more negotiation.
Suppliers with verified business licenses