Certification: | RoHS, CCC, ISO9001, CE |
---|---|
Working Medium: | R32 |
Heat Source Type: | Air Source Heat Pump |
Delivery Time: | 40-65days |
Color: | Silver/Customized |
Power Supply: | 380V/3pH/50Hz |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Our heating system is designed to meet EU standards, ensuring high efficiency and cost savings on electrical bills. With a low-carbon heating mechanism, you can reduce your heating bill while staying environmentally friendly.
The system features easy installation, WIFI control for convenience, and a DC inverter compressor and water pump for optimal performance. Our exclusive patent smart defrosting design ensures efficient operation even in low temperature environments.
Experience wide frequency running capabilities, making our system suitable for a variety of settings. Trust Guangdong Geme Refrigeration Equipment Co., Ltd for reliable and innovative heating solutions.
Model Code | CHP-8III/CD3 | CHP-10III/CD3 | CHP-12III/CD3 | CHP-14III/CD3 | CHP-16III/CD3 | |||
Power Supply | V/ph/Hz | 380-420/3/50 | ||||||
A7/W35 | Heating Capacity | KW | 8 | 10 | 12 | 14 | 16 | |
Heating Power Input | KW | 1.63 | 2.28 | 2.47 | 2.99 | 3.39 | ||
COP | W/W | 4.91 | 4.39 | 4.86 | 4.69 | 4.72 | ||
A-7/W35 | Heating Capacity | KW | 7.13 | 8.41 | 10.5 | 12.6 | 13.4 | |
Heating Power Input | KW | 2.38 | 2.8 | 3.48 | 4.34 | 4.41 | ||
COP | W/W | 3.00 | 3.00 | 3.02 | 2.9 | 3.04 | ||
A-7/W52 | Heating Capacity | KW | 6.8 | 8.5 | 10.6 | 12 | 12.5 | |
Heating Power Input | KW | 3.4 | 4.25 | 5.02 | 5.94 | 5.79 | ||
COP | W/W | 2.00 | 2.00 | 2.11 | 2.02 | 2.16 | ||
A-10/W55 | Heating Capacity | KW | 6.60 | 7.00 | 8.98 | 10.8 | 11.3 | |
Heating Power Input | KW | 3.47 | 3.68 | 5.19 | 5.93 | 5.95 | ||
COP | W/W | 1.90 | 1.90 | 1.73 | 1.82 | 1.90 | ||
A35/W18 | Heating Capacity | KW | 7.00 | 9.20 | 10.6 | 13.1 | 13.4 | |
Heating Power Input | KW | 1.52 | 2.00 | 2.57 | 3.25 | 3.54 | ||
COP | W/W | 4.60 | 4.60 | 4.13 | 4.03 | 3.78 | ||
A35/W7 | Cooling Capacity | KW | 6.40 | 7.90 | 10.5 | 12 | 13.6 | |
Cooling Power Input | KW | 2.13 | 2.43 | 3.68 | 4.21 | 4.98 | ||
EER | W/W | 3.00 | 3.25 | 2.85 | 2.85 | 2.73 | ||
Max input cerrent | A | 22 | 26 | 13 | 15 | 16 | ||
Max input power | KW | 4.4 | 5.3 | 6.5 | 7.4 | 8 | ||
Sound Power Level (EN12102 35ºC) | dB(A) | 56 | 58 | 60 | 62 | 64 | ||
Net/Gross weight | kg | 105/115 | 105/115 | 125/140 | 125/140 | 142/162 | ||
Operating Ambient Temperature | ºC | -25ºC-43ºC | ||||||
Water Flow | m3/h | 1.38 | 1.72 | 2.06 | 2.41 | 2.75 | ||
Unit outdoor Dimensions (L*W*H) | mm | 1091*424*798 | 1091*424*973 | 1091*424*1363 | ||||
Shipping Dimensions (L*W*H) | mm | 1162*518*885 | 1162*518*1060 | 1162*518*1450 |
* A7/W35:Performance Condition: Outdoor air 7ºC/6ºC, Inlet/Outlet water 30ºC/35ºC | |||||||||||||||
* A-7/W35:Performance Condition: Outdoor air -7ºC/-8ºC, Inlet/Outlet water 30ºC/35ºC | |||||||||||||||
* A-7/W52:Performance Condition: Outdoor air -7ºC/-8ºC, Inlet/Outlet water 44ºC/52ºC | |||||||||||||||
* A-10/W55:Performance Condition: Outdoor air -12ºC/-10ºC, Inlet/Outlet water 47ºC/55ºC | |||||||||||||||
* A35/W7:Performance Condition: Outdoor air 35ºC/24ºC, Inlet/Outlet water 7ºC/6ºC | |||||||||||||||
* A35/W18:Performance Condition: Outdoor air 35ºC/24ºC, Inlet/Outlet water 23ºC/18ºC | |||||||||||||||
* The above data is for reference only; specific data is subject to the product nameplate. | |||||||||||||||
* The above models and specification are for reference only,we can also make the OEM or ODM as per the customer's needs. |
At Guangdong Geme Refrigeration Equipment Co., Ltd, we proudly offer OEM and ODM services to meet your specific needs. Whether you require standard products under your brand or personalized designs, we can accommodate your requirements.
Our headquarters are situated in Foshan city, Guangdong Province, with a branch in Liuzhou city, Guangxi Province.
With a production capacity of 1,000,000 sets per year and 6 production lines, we ensure efficient manufacturing processes.
We are dedicated to providing excellent technical support, including manuals, online assistance, and the option to send technical experts for on-site training at the customer's expense.
Our products are highly sought after in Western Europe, Eastern Europe, Central, and Southeast Asia.
We accept T/T payment with a 30% deposit upfront and the remaining 70% before shipment. LC AT SIGHT is also accepted.
Our standard delivery time for heat pumps is typically 50-65 days.
We welcome small orders and encourage you to reach out for further negotiation.
Suppliers with verified business licenses