Certification: | RoHS, CCC, ISO9001, CE |
---|---|
Working Medium: | R32 |
Heat Source Type: | Air Source Heat Pump |
Delivery Time: | 40-65days |
Color: | Silver/Customized |
Power Supply: | 380V/3pH/50Hz |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Introducing the advanced heating solution from Guangdong Geme Refrigeration Equipment Co., Ltd. Our high-efficiency heating system is designed to meet EU standards, ensuring top-notch performance and reliability.
Experience the difference with our cutting-edge heating solution. Upgrade to our heating system today and enjoy high efficiency, low-carbon heating, and easy installation.
Model Code | CHP-8III/CD3 | CHP-10III/CD3 | CHP-12III/CD3 | CHP-14III/CD3 | CHP-16III/CD3 | |||
Power Supply | V/ph/Hz | 380-420/3/50 | ||||||
A7/W35 | Heating Capacity | KW | 8 | 10 | 12 | 14 | 16 | |
Heating Power Input | KW | 1.63 | 2.28 | 2.47 | 2.99 | 3.39 | ||
COP | W/W | 4.91 | 4.39 | 4.86 | 4.69 | 4.72 | ||
A-7/W35 | Heating Capacity | KW | 7.13 | 8.41 | 10.5 | 12.6 | 13.4 | |
Heating Power Input | KW | 2.38 | 2.8 | 3.48 | 4.34 | 4.41 | ||
COP | W/W | 3.00 | 3.00 | 3.02 | 2.9 | 3.04 | ||
A-7/W52 | Heating Capacity | KW | 6.8 | 8.5 | 10.6 | 12 | 12.5 | |
Heating Power Input | KW | 3.4 | 4.25 | 5.02 | 5.94 | 5.79 | ||
COP | W/W | 2.00 | 2.00 | 2.11 | 2.02 | 2.16 | ||
A-10/W55 | Heating Capacity | KW | 6.60 | 7.00 | 8.98 | 10.8 | 11.3 | |
Heating Power Input | KW | 3.47 | 3.68 | 5.19 | 5.93 | 5.95 | ||
COP | W/W | 1.90 | 1.90 | 1.73 | 1.82 | 1.90 | ||
A35/W18 | Heating Capacity | KW | 7.00 | 9.20 | 10.6 | 13.1 | 13.4 | |
Heating Power Input | KW | 1.52 | 2.00 | 2.57 | 3.25 | 3.54 | ||
COP | W/W | 4.60 | 4.60 | 4.13 | 4.03 | 3.78 | ||
A35/W7 | Cooling Capacity | KW | 6.40 | 7.90 | 10.5 | 12 | 13.6 | |
Cooling Power Input | KW | 2.13 | 2.43 | 3.68 | 4.21 | 4.98 | ||
EER | W/W | 3.00 | 3.25 | 2.85 | 2.85 | 2.73 | ||
Max input cerrent | A | 22 | 26 | 13 | 15 | 16 | ||
Max input power | KW | 4.4 | 5.3 | 6.5 | 7.4 | 8 | ||
Sound Power Level (EN12102 35ºC) | dB(A) | 56 | 58 | 60 | 62 | 64 | ||
Net/Gross weight | kg | 105/115 | 105/115 | 125/140 | 125/140 | 142/162 | ||
Operating Ambient Temperature | ºC | -25ºC-43ºC | ||||||
Water Flow | m3/h | 1.38 | 1.72 | 2.06 | 2.41 | 2.75 | ||
Unit outdoor Dimensions (L*W*H) | mm | 1091*424*798 | 1091*424*973 | 1091*424*1363 | ||||
Shipping Dimensions (L*W*H) | mm | 1162*518*885 | 1162*518*1060 | 1162*518*1450 |
* A7/W35:Performance Condition: Outdoor air 7ºC/6ºC, Inlet/Outlet water 30ºC/35ºC | |||||||||||||||
* A-7/W35:Performance Condition: Outdoor air -7ºC/-8ºC, Inlet/Outlet water 30ºC/35ºC | |||||||||||||||
* A-7/W52:Performance Condition: Outdoor air -7ºC/-8ºC, Inlet/Outlet water 44ºC/52ºC | |||||||||||||||
* A-10/W55:Performance Condition: Outdoor air -12ºC/-10ºC, Inlet/Outlet water 47ºC/55ºC | |||||||||||||||
* A35/W7:Performance Condition: Outdoor air 35ºC/24ºC, Inlet/Outlet water 7ºC/6ºC | |||||||||||||||
* A35/W18:Performance Condition: Outdoor air 35ºC/24ºC, Inlet/Outlet water 23ºC/18ºC | |||||||||||||||
* The above data is for reference only; specific data is subject to the product nameplate. | |||||||||||||||
* The above models and specification are for reference only,we can also make the OEM or ODM as per the customer's needs. |
Product Description:
Are you looking for high-quality OEM & ODM refrigeration equipment? Look no further than Guangdong Geme Refrigeration Equipment Co., Ltd. We specialize in producing standard products under clients' brands and can also design personalized products to meet your specific requirements.
Our factory is strategically located in Foshan city, Guangdong Province, with a branch in Liuzhou city, Guangxi Province. With an annual production capacity of 1,000,000 sets and six production lines, we are well-equipped to meet your demands.
At Geme Refrigeration, we not only provide top-notch products but also offer excellent technical support. We can provide you with technical manuals and online support, and if needed, our technical experts can even provide on-site training in your country (training cost to be paid by the customer).
Our products have gained popularity in various markets, including Western Europe, Eastern Europe, Central, and Southeast Asia. We ensure timely delivery, with a standard lead time of 50-65 days.
When it comes to payment, we accept both T/T (30% deposit in advance, balance 70% before shipment) and LC AT SIGHT.
Whether you have a large order or a small one, we are here to serve you. We welcome small orders and are open to negotiation. Contact us today for more information!
Suppliers with verified business licenses